Ansteel Co., Ltd. Energy Management and Control Center builds 300T liquefaction equipment equipment installation project
4#Boiler economizer newly installed weld inspection
Non-destructive testing project of Benxi Iron and Steel Plant
Benxi Iron and Steel Industrial Waste Heat Heating Project Phase I Pingshan to Yuming Primary Network, Slag Flushing Water and Power Generation Networking Project
Ultrasonic testing of pin and ladle trunnion
3# furnace economizer installation weld inspection
Benxi Juxinda Machinery Manufacturing Co., Ltd. Non-destructive testing of the shaft lugs of molten iron ladle
Ladle, hook
Ladle