Construction unit: The Second Power Plant of Anshan Iron and Steel Group Co., Ltd.
Project name: 3# furnace economizer installation weld inspection
Year: 2020
Previous: China Water Resources and Hydropower 14th Engineering Bureau Co., Ltd.
Next: Benxi Iron and Steel (Group) Mechanical and Electrical Installation Engineering Co., Ltd.